Cycle-1 final candidate · Fable conditions closed · HDO act pending
P-PH000-AC008-GATE001Cycle 01

Confirm the remediated workscope package

Cycle 0 was RECYCLE. TK005 is complete and Consultant-accepted. Fable 5/high then reviewed the full cycle-1 package at 590d344e…, returned ACCEPT WITH CONDITIONS, and the HDO authorized the bounded mechanical closure. CHECK001 remains complete historical assurance; the next act belongs to the HDO at this same GATE001.

Gate package
PR #486 · open, unmerged
Control ledger
Issue #449
CHECK001
Complete historical assurance · not reopened
Immutable package basis
4a1fdce2…
What actually counts as the HDO act

An explicit durable merge, recycle, or hold disposition on PR #486 and/or the #449 ledger. On approval, the merge event and merge-hash-bound #449 acceptance ledger complete the proof trail.

Checkboxes, selected cards, and generated text below are local working aids only. They do not approve, authorize, merge, close, or modify anything—and they do not imply the HDO has acted.

1
RECYCLE and assurance closure complete; HDO disposition is next
R
Cycle 0
HDO RECYCLE
Recorded
Same GATE001 retained; registry altitude, SPS placement and metadata sent to TK005.
5
TK005
Remediation
Complete
Canonical SPS migration, Program registry, D3 and authority cleanup.
QA
Task review
Independent PASS
0 findings
Cycle-1 full-scope review; Consultant accepted the return.
C1
Package
Cycle-1 candidate
Assembled
Current immutable evidence basis 4a1fdce2.
F
Cycle 1
Fable gate review
Closed
ACCEPT WITH CONDITIONS; six findings, one material; bounded conditions mechanically closed without a second round.
H
Next
HDO decision
Pending
Durable merge, recycle, hold or kill act on PR #486 and/or #449.
M
Conditional
Merge + ledger
Blocked
Only after approval: exact merge and merge-hash-bound #449 ledger.

The accepted CHECK000 architecture remains the merits boundary. AC008 encodes Initiative and Feature as the only new SID-bearing workscope tiers, Epic as mutable non-authoritative grouping, Story as removed, and Initiative-rooted Timeline UIDs as explicit workscope targets.

This is re-presentation, not re-adjudication. CHECK001 remains complete. The old cycle-0 QA staging and hash are superseded presentation evidence. The Fable review is advisory gate assurance—not a new checkpoint—and its bounded closure does not perform the HDO act.

2
What enters authority—and what remains outside this package

Merging does

  • Accept P-STD-009's Initiative + Feature SID taxonomy, Feature lifecycle/resolver, EG-<slug> grouping, explicit targeting, lineage, and legacy freeze.
  • Land coordinated P-STD-002/004/005/008 and Program WDL alignment plus Program SPS discovery/resolver interfaces.
  • Accept the TK004 census boundary: 17 Epic-root families plus separately frozen Feature-root residue T102A1.
  • Accept R-001–R-007 as explicit owner-bound residue—not as completed receiving work.
  • Authorize maintainer merge of the exact package only after the explicit HDO act; merge hash then anchors the #449 acceptance ledger.

Intentionally does not

  • Mutate PM board schema/options or T106 tooling/helpers; R-006 remains conditional and untriggered.
  • Migrate or rename per-Initiative legacy identities, paths, owners, registries, plans, or files.
  • Revive Story as an SID-bearing workscope tier; Request/Design Story assumptions remain owner-routed legacy reconciliation.
  • Edit AC004-owned SPS/guidance/templates, Request/Design templates, scaffold/validator/tests, or the tools catalog.
  • Complete R-001–R-007, close #449/#481–#484, or make P-STD-009 authoritative before HDO recorded act + merge + merge-hash-bound #449 ledger.
3
Recycle-gap closure and cycle-1 package integrity

Tick a claim only after inspecting its pinned evidence. Every file link is SHA-pinned so it survives branch deletion; every repo file also carries a copy control for local or IDE navigation.

Working through the matrix0 / 24 confirmed
A Recycle-gap closure · prior conditions and controlled remediation

The original mechanical conditions remain traceable; TK005 then closes the HDO's cycle-0 registry, placement, authority and metadata gaps without reopening CHECK001.

M-01C1 · normative references
How to verify
Open the closure commit; confirm one P-STD-009 row in all four standards and corresponding changelog-only traces. The delta must not change CHECK000 architecture.
M-02Recycle gap · register_ removal
How to verify
Search current normative rows for register_: no generic live rule remains. Historical/changelog mentions remain truthful.
M-03C3 · exact group grammar
How to verify
Confirm the production is [a-z0-9][a-z0-9-]{0,38}[a-z0-9]; inspect the standard changelog for the condition-closure trace.
M-04C4 · legacy annotations
How to verify
Read each clause standalone. Neither may authorize new Epic/Story-scoped identity minting or new Epic research placement.
B Package integrity, assurance limit, and gate proof

Eleven claims about the reviewed package and the exact decision boundary. Row M-14 is an explicit assurance-limit acceptance—not hidden assurance.

M-05Reviewer authorship · immutable REVIEW
How to verify
Confirm frontmatter author/model/session/head and §II direct-write boundary. Compare the blob at the REVIEW commit with the package version; later closure must not amend REVIEW prose.
M-06#481–#484 · 29 criteria
How to verify
Use the REVIEW's acceptance-criteria matrix and Round Changelog. Confirm seven TK001, seven TK002, seven TK003, and eight TK004 criteria = 29 total.
M-07P-STD-009 doctrine
How to verify
Inspect CLAUSE-001–010 and ADR-001: Feature minting/lifecycle, Initiative-owned registry, Epic metadata, explicit UID targets, lineage, legacy freeze, and extension boundaries.
M-08Standards + WDL integrity
How to verify
Trace P-STD-002-CLAUSE-058, P-STD-004-CLAUSE-005/006, P-STD-005-CLAUSE-008A/008L, P-STD-008-CLAUSE-007D, and WDL execution-target guidance.
M-09Program SPS placement
How to verify
Confirm sps_P.md is the sole current canonical SPS path, Section C holds registry/breakdown, Section D holds terms, and no live resolver points into AC008/internal.
M-10Census + family freeze
How to verify
Run the two frozen-baseline commands in register §II. Confirm all 17 Epic-root rows and the separate Feature-root row include owner, disposition, resolution, and evidence.
M-11Route integrity
How to verify
Compare every row in §V with §4 below. R-002/R-003 must remain orphan-visible; R-006 conditional/untriggered; R-007 one deferred bundle.
M-12Merge semantics
How to verify
Read evidence package posture/open routes and plan gate entry/exit criteria. Confirm authority begins only after recorded act, merge, and #449 ledger.
M-13Developer validation
How to verify
Confirm the governed runner result and exact closure assertions. This row records Developer-attested validation; independent-review limits are separately accepted in M-14.
M-14⚠ Historical CHECK001 assurance limit
How to verify
Inspect the historical CHECK001 head and exact runner limitation. Do not extend that Markdown-only statement to TK005, which later added a Python census reporter.
M-15Gate proof + authority
How to verify
Confirm the review exchange, exact condition-closure delta, final staging hashes and PR cycle-1 body. Confirm no HDO act, merge, ledger or closeout has occurred.
M-16D3 · EG-<slug>
How to verify
Read the group-key grammar, rename, retirement/successor and legacy-alias rules together; confirm no legacy token can be minted as a current group key.
M-17Conditional accepted metadata
How to verify
Check status/effective/approval fields and Program index wording. No field may imply present authority while PR #486 remains open.
M-18COMM + AC004 boundary
How to verify
Confirm #393 → #499 final relationship, #499 off-board state, receiving links, and the repository zero-touch assertion for AC004-owned surfaces.
M-19Execution-incident recovery
How to verify
Read REVIEW §IV and the accumulating EVIDENCE incident record; confirm no history rewrite or cross-owner repository mutation hid the recovery.
M-20Evidence + provenance
How to verify
Trace every TK005 criterion to an evidence section and the zero-finding REVIEW. Confirm starting/final SHAs and producer attribution are explicit.
M-21⚠ TK005 review assurance variance
How to verify
Compare REVIEW §III with the base-to-head file list and the reporter commit. Confirm the Fable packet is required to assess this variance and that no one claims the task Reviewer independently ran pytest.
M-22Fable gate review · conditions closed
How to verify
Read the raw verdict and Consultant disposition, then compare the reviewed-to-final delta: PR-body replacement, meter 15→24, evidence grammar wording, SPS illustrative label, result/evidence integration and hosted QA proof only.
M-23HDO recorded-act semantics
How to verify
Confirm checkbox state, decision-card selection, copied text, Fable review and HTML staging are all non-authoritative aids.
M-24Cycle-1 hosted identity
How to verify
Compare the final stable staging URL, source/staged/served hashes, noindex headers, one-document request and desktop/mobile Playwright record in consolidated evidence.
4
Seven routes remain explicit after acceptance

Program SPS is the live workscope resolver; the TK004 register is retained only as historical census/freeze and route evidence. Every row below states its disposition, and receiving owners retain authority.

Routed open
R-001 · T102-PH001-AC004 owner

At AC004 CHECK001, consume accepted FSID registry, grouping, targeting, and legacy resolver interfaces. AC008 edits no AC004-owned surface.

Orphan visible
R-002 · T102B Request domain owner

Receiving activity not yet selected. Remove new Story-SID minting, use Task UIDs, preserve historical Story resolution.

Orphan visible
R-003 · T102D Design domain owner

Receiving activity not yet selected. Remove new Story-SID minting in Design templates/logs while retaining historical links.

Routed open
R-004 · P-PH000-AC009 / #450

Consume the accepted taxonomy in P-STD-001 reconstruction and Concept reconciliation without rewriting AC008 lineage.

Per owner
R-005 · each Initiative owner

On next governed touch, preserve frozen IDs, stop legacy minting, and add resolver/lineage evidence where a material change occurs; no bulk migration.

Conditional
R-006 · T106 owner

Not triggered. If board-visible compatibility becomes necessary, T106 owns schema/helper approval, rollback/export evidence, and option-ID preservation.

Deferred bundle
R-007 · future tooling owner

After acceptance and owner authorization, implement scaffold, validator, regression tests, and tools catalog together—never a partial script-only change.

5
Choose a working disposition, then record it durably

The exact durable act: post an unambiguous GATE001 disposition on PR #486 and/or #449. For merge, bind approval to this exact package and preserve the acknowledged M-14 and M-21 assurance limits. After merge, record the merge hash and acceptance mapping on #449.

Non-authoritative state: completing the matrix, selecting a card, or copying the generated record does not perform that act. inspect is intentionally not a gate disposition.

Incomplete: confirm all claims and select a working disposition.

    
Provenance & self-conformance

This artifact

  • Current state: final cycle-1 HDO candidate after Fable review and authorized condition closure; HDO disposition remains pending.
  • Reviewed package: 590d344e9fca7a8e48491d3d4b79e0e333538ef9
  • Review record: ff4fdc3f1f77c3e9030656ef25f20db0307eca1c
  • Staging identity: final stable URL and source/staged/served hashes live in consolidated evidence; this page does not self-attest hosted-byte identity.
  • Construction: one self-contained HTML file · strict CSP · noindex/nofollow · zero external runtime resources

Conformance statement

This surface follows the P-STD-008 package-shaped gate grammar: journey and prior assurance (§1); precise merge effects/exclusions (§2); traceable claims with HDO confirmations (§3); explicit residue/owners/dispositions (§4); and durable recorded-act semantics (§5). Its interactive state is deliberately non-authoritative.